Bring paving and drainage to the same discussion
Tempe’s Private Development Engineering page describes civil review for residential and commercial private development, including city rights-of-way and on-site drainage. Its permit categories distinguish Paving (PV), including driveways and sidewalks within ROW, from Drainage (DR), including retention and stormwater features.
Those categories help you route a question. They do not mean every patio needs both permits. Verify the actual jurisdiction, draw the private surface and street connection, and mark existing drains or retention areas. Ask the PDE team which features of your proposal need review. A private paving footprint can still raise an on-site drainage question without becoming public street work.
Tempe worksheet: match the feature to the question
Make a feature list before choosing a portal application. Keep one line for each change rather than marking the whole job “patio.” Add the city’s answer, the required record and the person responsible. This is a homeowner’s routing sheet, not a city form.
| Feature on your sketch | Question to route | Answer to keep |
|---|---|---|
| Driveway apron or public sidewalk | Does the ROW work need a Paving (PV) record? | Boundary, applicable approval and inspection lane |
| Changed runoff or retention | Does this affect a Drainage (DR) review? | Required drawings and responsible designer |
| Cover, posts, shed or enclosure | Which building and planning checks apply? | Linked structure scope and supporting design |
| Ordinary private surface | What applies when the other features are absent? | Written answer tied to the full description |
| Work ready for inspection | Is this building or private engineering inspection? | Correct record, stage and accepted result |
Decide whether to revise the layout first
If the patio would cover an existing drainage feature or send water somewhere new, resolve that part before choosing decorative finishes. If an apron crosses ROW, keep that paving lane separate from the backyard work. If posts or a building will be supported, include them now so the slab is assessed for its intended role.
If all you want is a private surface repair with no such changes, ask about that exact limited job. Do not add a guessed permit code or treat this matrix as an exemption chart. If the city asks for a different layout, have the contractor update the quantity and scope before a price based on the old drawing becomes your contract.
Submit through the city’s current access route
The Permit Center says applications go online through the Tempe Citizen Access Portal and require a registered account. Identify the correct review first, then follow the current application instructions. Keep the application number and uploaded plan revision with the feature list.
Ask who will be the applicant, answer review comments and retain approved documents. An uploaded file or a payment receipt is not the same as an issued permit. For work involving an HOA, utility owner or another authority, keep those responses distinct from the city record. Permission from one party does not settle the others’ responsibilities.
Plan for the correct inspection and its result
Tempe’s Inspections page distinguishes building and private engineering references. Its building guidance requires inspector approval before the next construction step and provides Citizen Access scheduling. Ask which inspection lane, record and stages apply to your actual permit, rather than assuming a general building appointment clears a PDE condition.
Agree who books the check and provides site access. Keep work visible where required, and record the result before proceeding. Ask what happens if a correction changes levels or delays concrete delivery. Do not use a portal appointment, a contractor’s diary entry or the arrival of a truck as evidence that the city has accepted the work.
Describe each concrete use clearly
- Driveway planning: Identify the private area, entrance and public connection. Ask about vehicle access, any revised curb work and protection for nearby drainage features.
- Patio planning: Show doors, roof runoff, pool edges and shade. Separate an outdoor surface from its future cover and ask who confirms the finished levels.
- Slab planning: Name equipment, structures, anchors and service runs. Get thickness, reinforcement and footing decisions from the responsible professional before estimating volume.
- Repair planning: Supply photos of cracks, lifted edges and ponding. Ask whether repair changes the water path or masks movement that needs assessment first.
Compare responsibility as well as price
Ask each quote to cover excavation, removal, base preparation, access, finish, joints, curing and cleanup. State whether drawings, approvals, inspection attendance and changes are included. The comparison worksheet flags missing scope. Use the volume calculator with a supplied design, and the budget tool with actual bid rates and allowances.
Verify the actual contractor’s ROC license, suitable scope and insurance. Keep household access and curing duties in the written handover. Before an optional contact request, read the operator explanation. Include Tempe, your ZIP and whether paving, drainage or a structure remains unresolved. Sending the request cannot guarantee a response time or match.
Tempe sources checked in the browser
| Source | Use in this guide | Checked |
|---|---|---|
| Private Development Engineering | Separate paving (PV) and drainage (DR) questions; includes residential and commercial civil review. | October 24, 2026 |
| Permit Center | Registered Citizen Access account for application submission; the portal does not select the design. | October 24, 2026 |
| Inspections | Building approval before the next stage and separate private engineering inspection references. | October 24, 2026 |