Give Development Services one complete sketch
First confirm that the parcel and work area fall within Chandler’s jurisdiction. A Chandler mailing label alone is not enough. Mark your house, proposed paving, gates, property edges and the street connection. Show replacement and added area separately. Include a proposed roof, shed, wall or utility trench even if another firm will build it later.
Chandler Development Services lists building, planning and civil review routes. Ask staff which teams need your sketch and whether any part needs plans or a permit. The department’s existence is not a ruling that every private slab requires the same application. Record what you described so a later change does not quietly inherit an earlier answer.
Split civil records when the city calls for them
The city’s Civil Plan Review and Inspections guidance lists paving, grading, drainage and retention within civil site work. Its improvement-plan instructions say on-site and off-site plans use separate submissions and different City Log Numbers. It also lists a civil improvement/encroachment and street-cut application. Ask which of those routes fits your boundary work.
This is a reason to separate the records, not to submit a development package for every patio. For a driveway that reaches the street, have the city identify the public-work limit. Ask the contractor to price that portion separately and identify the applicable permit, drawings and inspection contact. Do not assume the private slab’s approval covers the apron.
Chandler worksheet: two scopes, two records
Copy this table into your project notes. Fill only the lanes the city says apply. Use “not confirmed” for unanswered questions, rather than leaving a blank that someone may read as permission. These are your planning notes, not a city form.
| Record | Private/on-site scope | Off-site/public scope |
|---|---|---|
| Drawing boundary | Patio, pad or private driveway area | Apron, sidewalk, curb or street disturbance |
| City routing answer | Building, planning or civil reviewer | Civil or encroachment reviewer |
| Required record | Plan revision and City Log Number, if required | Separate off-site log and permit, if required |
| Before placement | Required inspection and person booking it | Public-work inspection and access conditions |
| Closeout | Result or written exemption basis | City result and any remaining corrections |
Choose the next step from the split
If everything is private paving, take that exact description to the appropriate Development Services team. Resolve questions about grade changes, structures and property limits before accepting a scope. If work crosses into the public lane, keep the off-site answer and price line visible. If you cannot identify the boundary, pause that portion of the quote until the city resolves it.
If a contractor offers one total for both lanes, request a breakdown. Ask who obtains each approval, who can revise the plans and what happens if one lane is delayed. That avoids scheduling demolition around an approval that belongs to a different part of the job.
Ask different questions for each surface
- Driveways: Is this replacement, widening or a changed entrance? Which portion meets public paving, and how will vehicles reach the house during the work?
- Patios: Are door levels and runoff staying the same? Are posts, a cover or a future enclosure part of the proposal? Keep HOA review separate.
- Slabs: What will the pad support, and will anything be anchored? Have the responsible professional determine the design; a flat area measurement cannot select reinforcement or footings.
- Repair: Is damage limited to private concrete or does it extend into a sidewalk? Supply photos and movement history. A surface patch does not establish the cause of settlement.
Tie inspections to the actual permit
Chandler’s inspections page describes requests using a permit number, inspection code and date. Its civil list includes concrete and paving stages. Ask which codes apply to your issued permit and which work must remain visible. A code on a general list does not mean every homeowner needs that inspection.
Name the person who will request, confirm and record each result. Keep a correction or cancellation with the same permit record. Before concrete delivery, ask whether all required preceding checks have passed. A request acknowledgment is not an inspection approval.
Compare complete bids, then request contact
Use the volume calculator with dimensions and thickness supplied by your contractor. Put actual quoted rates and separate approval allowances into the cost tool. The quote comparison worksheet can flag missing removal, base, finish, curing and change terms without judging a contractor’s skill.
Check the actual firm’s current Arizona ROC record, scope and insurance before hiring. Agree on cleanup, protection and written return-to-use instructions. Review the heat-planning questions, then read how this service works before an optional contact request. Include Chandler and your ZIP in the project details. A saved request does not reserve a crew or promise a match.
Official Chandler source record
| Source | Use in this guide | Checked |
|---|---|---|
| Chandler Development Services | Route private building, civil and planning questions to the responsible review team. | October 24, 2026 |
| Civil Plan Review and Inspections | Civil improvement/encroachment applications and separate on-site/off-site plan records. | October 24, 2026 |
| Chandler Inspections | Inspection requests use the actual permit number, inspection code and requested date. | October 24, 2026 |